Borralha Tungsten Project
Allied Critical Metals is advancing Borralha through exploration and development
Borralha Project Overview
Borralha Resource Technical Report
Brownfield project with past production and past production at northern side of the Borralha property from 1904-1985 of over 10,280 tonnes wolframite concentrate with an average grade of 66% WO₃.
In November 2025, the Borralha Tungsten project was designated of “strategic national importance” by the idD Portugal Defence. Environmental Impact Declaration (DIA) received (Jan 2026) — clearing a major permitting hurdle and enabling progression into detailed engineering and development. Borralha is advancing through Portugal’s mine licensing pathway under APA and DGEG.
Location: Town of Borralha is 60km east of the city of Braga and 100km northeast of the city of Porto.
Borralha Resource Technical Report
ACM announced a material increase to the Mineral Resource Estimate (MRE) for Borralha’s Santa Helena Breccia (SHB) — effective Nov 16, 2025, reported at a 0.09% WO₃ cut-off.(1)
|
Classification |
Tonnes (Mt) |
WO₃ % |
Contained WO₃ (t) |
|---|---|---|---|
|
Measured |
1.0 | 0.22 |
2,088 |
|
Indicated |
12.0 | 0.21 |
24,974 |
|
Measured + Indicated (M+I) |
13.0 | 0.21 |
27,062 |
|
Inferred |
7.7 | 0.18 |
13,878 |
Only about half of the Santa Helena Breccia zone has been drilled, so significant exploration potential remains in the breccia itself as well as the broader property, all of which will be a priority for the upcoming work programs.
2025 Drilling Program
Highlights from Drilling Program
Mine Plan & Processing Flowsheet
Underground stoping with paste backfill, feeding a 1.4 Mtpa gravity-dominant plant.
Mine Plan
|
MINING INVENTORY |
12.37 Mt @ 0.21% WO₃ |
|---|---|
|
METHOD |
Sublevel Open Stoping, supplemented by Drift & Fill |
|
BACKFILL |
Paste at 70% solids, cemented and pumped back into mine voids — no surface tailings facility |
|
DEVELOPMENT |
49,818 m total: 19,141 m capital and 30,677 m operational |
|
PRODUCTION AREAS |
Three, developed just-in-time from a single descending ramp |
| RAMP-UP |
~900 kt in 2030, 1.0 Mt in 2031, stabilising at 1.4 Mtpa |
|
POWER |
60 kV overhead line to the SE Frades substation |
Processing Flowsheet
- 1
CRUSHING
Three-stage closed circuit, 500 mm to 6 mm. Primary jaw crusher underground - 2DENSE MEDIA SEPARATION
Treats the 6–2 mm fraction and rejects ~40% of the barren mass as coarse tailings - 3GRINDING
Ball mill in closed circuit with a 1 mm screen - 4GRAVIMETRIC CONCENTRATION
Spirals and shaking tables on coarse fractions; Falcon and MGS units recover the sub-20 µm stream - 5SULPHIDE / COPPER FLOTATION
Cleans the tungsten concentrate and produces a saleable copper concentrate - 6DEWATERING & PURIFICATION
Drying, dry magnetic and electrostatic separation into separate W and Sn concentrates
Crushing operates 14 hours per day at 87.5% availability; downstream processes operate 24 hours per day at 94.4% availability, 360 days per year. Closure and rehabilitation provisioned at US$1.5M. Source: Allied Critical Metals Inc., NI 43-101 Technical Report — Preliminary Economic Assessment, Borralha Tungsten Project, effective April 14, 2026. All figures post-tax, nominal USD. Capital estimate precision ±35%. This PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered too geologically speculative to have economic considerations applied that would enable classification as Mineral Reserves. There is no certainty the PEA results will be realized.